document required
Performance
If you are a designer you must present:
Original
• Phase: Request for approval of the project
Original
Company charter
Original and Copy
Power of Attorney granted by the developer
Original and Copy
Identifications official who signed the letter to
Original and Copy
Request for review and approval of project
Original and Copy
• Phase: Adoption of the draft
Original
Technical descriptive memory
Original and Copy
Draft medium and low voltage
Original and Copy
three wire diagram
Original and Copy
Street lighting project (optional)
Original and Copy
Plane subdivision approved by the competent authority (optional)
Original and Copy
Authorizations and / or permits issued by the competent authorities (optional)
Original and Copy
CTRS file (optional)
Original and Copy
If you are a builder you must present:
Original
Power of Attorney granted by the developer
Original and Copy
Identifications official who signed the letter to
Original and Copy
Notice of commencement of work
Original and Copy
Notice of termination of work
Original and Copy
final construction drawings and electronic archiving georeferenced in DEPRORED
Original and Copy
Responsive Charter for CFE
Original and Copy
Acta handover of the work
Original and Copy
Physical inventory valued
Original and Copy
Original invoices endorsement for CFE, equipment and materials installed
Original and Copy
Report results issued by accredited testing laboratory bearing the official emblem of the national system for accrediting testing laboratories.SIGLA03 chain
Original and Copy
Test results commissioning of the equipment, if applicable
Original
legal easement contract, if applicable
Original
street lighting contract, if applicable
Original and Copy
costs
Concept
Rode
Procedure
Gratuitous